On a flow-shop scheduling problem with fuzzy pentagonal processing time
Summary: Scheduling involves planning and arranging jobs across a coordinated set of events to satisfy the customer's demands. In this article, we present a simple approach for the flow-shop (FS) scheduling problem under fuzzy environment in which processing time of jobs are represented by pentagonal fuzzy numbers. This study is intended to reduce the rental cost of the machine in compliance with the rental policy. The fuzzy FS scheduling problem is solved without converting the processing time into its equivalent crisp numbers using a robust ranking technique and a fuzzy arithmetic pentagonal fuzzy numbers. A numerical illustration indicates that the approach is workable, accurate, and relevant.
- scientific article; zbMATH DE number 1728416
- Scheduling of flow shop problems on 3 machines in fuzzy environment with double transport facility
- scientific article; zbMATH DE number 1750161
- Solving Job-Shop Scheduling Problems with Fuzzy Processing Times and Fuzzy Due Dates
- Parallel machine scheduling models with fuzzy processing times
- A local search algorithm for the flow shop scheduling problem with release dates
- A new approach for ranking of trapezoidal fuzzy numbers
- A procedure for ordering fuzzy subsets of the unit interval
- Constructing a fuzzy flow-shop sequencing model based on statistical data
- Decision-Making in a Fuzzy Environment
- Fuzzy scheduling with application to real-time systems
- Fuzzy sets
- Fuzzy sets and systems. Theory and applications
- Job sequencing with fuzzy processing times
- Optimal two- and three-stage production schedules with set-up time included
- Solving constrained flow-shop scheduling problem through multistage fuzzy binding approach with fuzzy due dates
- The pentagonal fuzzy number: its different representations, properties, ranking, defuzzification and application in game problems
- Solving constrained flow-shop scheduling problem through multistage fuzzy binding approach with fuzzy due dates
- Scheduling of flow shop problems on 3 machines in fuzzy environment with double transport facility
- A heuristic approach to minimizing the waiting time of jobs in two stage flow shop scheduling