Why does a railway infrastructure company need an optimized train path assignment for industrialized timetabling?
From MaRDI portal
Publication:2806909
DOI10.1007/978-3-319-28697-6_20zbMATH Open1342.90018OpenAlexW2409953287MaRDI QIDQ2806909FDOQ2806909
Authors: Matthias Feil, Daniel Pöhle
Publication date: 19 May 2016
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-28697-6_20
Recommendations
- Modelling and solving a train path assignment model with traffic day restriction
- A novel approach to strategic planning of rail freight transport
- On one approach to constructing timetables of freight trains in a railroad network
- What are new insights using optimized train path assignment for the development of railway infrastructure?
- Freight railway operator timetabling and engine scheduling
Cites Work
Cited In (2)
This page was built for publication: Why does a railway infrastructure company need an optimized train path assignment for industrialized timetabling?
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2806909)