Parallel machine scheduling with a single server: loading and unloading
From MaRDI portal
Publication:2867112
DOI10.1007/978-3-319-03780-6_10zbMATH Open1407.90155OpenAlexW954651000MaRDI QIDQ2867112FDOQ2867112
Authors: Jueliang Hu, Jianming Dong, Yiwei Jiang, Qinghui Zhang
Publication date: 10 December 2013
Published in: Combinatorial Optimization and Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-03780-6_10
Recommendations
- Single-server parallel-machine scheduling with loading and unloading times
- LS and LPT algorithms for two-machine scheduling with a loading server and an unloading server
- Scheduling on two parallel machines with two dedicated servers
- An optimal preemptive algorithm for the single-server parallel-machine scheduling with loading and unloading times
- Online algorithms for scheduling two parallel machines with a single server
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Bounds for Certain Multiprocessing Anomalies
- Parallel machine scheduling with a common server
- Complexity results for flow-shop problems with a single server
- Complexity results for parallel machine problems with a single server
- Equal processing and equal setup time cases of scheduling parallel machines with a single server
- Scheduling a single server in a two-machine flow shop
- An approximation algorithm for parallel machine scheduling with a common server
- Parallel machine scheduling problems with a single server
- Parallel machine scheduling with multiple unloading servers
- Scheduling two parallel machines with a single server: the general case
- Scheduling parallel machines with a single server: Some solvable cases and heuristics
- Scheduling with multiple servers
- Asymptotically optimal schedules for single-server flow shop problems with setup costs and times
- Online LPT algorithms for parallel machines scheduling with a single server
- On-line scheduling of two parallel machines with a single server
- The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
Cited In (13)
- LS and LPT algorithms for two-machine scheduling with a loading server and an unloading server
- Server scheduling on parallel dedicated machines with fixed job sequences
- Online algorithms for scheduling two parallel machines with a single server
- Minimizing the makespan on two parallel machines with a common server in charge of loading and unloading operations
- An optimal preemptive algorithm for the single-server parallel-machine scheduling with loading and unloading times
- General variable neighborhood search for the parallel machine scheduling problem with two common servers
- Block models for scheduling jobs on two parallel machines with a single server
- Parallel machine scheduling with multiple unloading servers
- Parallel machine scheduling with a common server
- Scheduling on two parallel machines with two dedicated servers
- Loading and Sequencing on Parallel Machines
- A bi-criterion algorithm for minimizing machine interference and reducing job waiting time
- Single-server parallel-machine scheduling with loading and unloading times
This page was built for publication: Parallel machine scheduling with a single server: loading and unloading
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2867112)