Batch scheduling on a two-machine jobshop with machine-dependent setup times
From MaRDI portal
Publication:2892129
DOI10.1002/nav.20473zbMath1241.90053OpenAlexW2015215729MaRDI QIDQ2892129
Publication date: 18 June 2012
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.20473
Related Items
Solving the serial batching problem in job shop manufacturing systems, A note on batch scheduling on a two-machine flowshop with machine-dependent processing times
Cites Work
- Batch scheduling on two-machine flowshop with machine-dependent setup times
- A note on flow-shop and job-shop batch scheduling with identical processing-time jobs
- A survey of scheduling problems with setup times or costs
- Open-shop batch scheduling with identical jobs
- Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops
- Computational Complexity of Discrete Optimization Problems
- Unnamed Item