scientific article; zbMATH DE number 4016578
From MaRDI portal
Publication:3028705
Recommendations
- Performance evaluation of unbalanced serial production lines
- An empirical investigation of the two-moment approximation for production lines
- The Throughput Rate of Multistation Production Lines with Stochastic Servers
- Throughput for production lines with serial work stations and parallel service facilities
- Optimal design of production lines
Cited in
(5)- Production rate optimization in a two-stage system with finite intermediate storage
- Modeling and Performance Evaluation of a Series-parallel Flow Line System with Finite Buffers
- Optimal buffer inventories for multistage production systems with failures
- Manufacturing flow line systems: A review of models and analytical results
- scientific article; zbMATH DE number 1533201 (Why is no real title available?)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3028705)