Computing the probability distribution of project duration in a PERT network
From MaRDI portal
Publication:3032046
DOI10.1002/NET.3230200208zbMath0689.90029OpenAlexW2102077730MaRDI QIDQ3032046
Publication date: 1990
Published in: Networks (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/net.3230200208
sensitivity analysisprobability distributionproject durationcomputations of characteristicsstochastic project network
Stochastic network models in operations research (90B15) Deterministic scheduling theory in operations research (90B35)
Related Items (11)
A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing ⋮ An optimization model for stochastic project networks with cash flows ⋮ Network reliability: Heading out on the highway ⋮ A factoring approach for the stochastic shortest path problem ⋮ A new approximation algorithm for obtaining the probability distribution function for project completion time ⋮ Bounding the distribution of project duration in PERT networks ⋮ The exact overall time distribution of a project with uncertain task durations ⋮ Stochastic task networks -- trading performance for stability ⋮ Global optima results for the Kauffman \(NK\) model ⋮ Resource-constrained project scheduling: Notation, classification, models, and methods ⋮ Evaluating project completion time in project networks with discrete random activity durations
Cites Work
This page was built for publication: Computing the probability distribution of project duration in a PERT network