Balancing fuzzy multi-objective two-sided assembly lines via Bees Algorithm
From MaRDI portal
Publication:3081985
DOI10.3233/IFS-2010-0464zbMath1211.90324OpenAlexW1688597714MaRDI QIDQ3081985
Publication date: 9 March 2011
Published in: Journal of Intelligent & Fuzzy Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3233/ifs-2010-0464
two-sided assembly line balancing problemfuzzy multi-objective programmingbees algorithm, soft computing
Multi-objective and goal programming (90C29) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (4)
Balancing stochastic two-sided assembly line with multiple constraints using hybrid teaching-learning-based optimization algorithm ⋮ Comprehensive review and evaluation of heuristics and meta-heuristics for two-sided assembly line balancing problem ⋮ Balancing two-sided U-type assembly lines using modified particle swarm optimization algorithm ⋮ Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem
This page was built for publication: Balancing fuzzy multi-objective two-sided assembly lines via Bees Algorithm