Models and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problem
DOI10.1007/S11081-021-09696-YzbMATH Open1519.90129MaRDI QIDQ6159499FDOQ6159499
Authors: Zixiang Li, Ibrahim Kucukkoc, Qiuhua Tang, Zikai Zhang
Publication date: 20 June 2023
Published in: Optimization and Engineering (Search for Journal in Brave)
Recommendations
- scientific article; zbMATH DE number 7028926
- An adaptive genetic algorithm-based and AND/OR graph approach for the disassembly line balancing problem
- A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
- A balancing method and genetic algorithm for disassembly line balancing
- Balancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approach
integer programmingmulti-objective optimizationartificial bee colonydisassembly line balancingbee algorithmU-shaped disassembly line
Multi-objective and goal programming (90C29) Approximation methods and heuristics in mathematical programming (90C59) Applications of mathematical programming (90C90) Mixed integer programming (90C11)
Cites Work
- Disassembly line in product recovery
- A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
- Profit-oriented disassembly-line balancing
- A balancing method and genetic algorithm for disassembly line balancing
- A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
- Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
- A branch, bound, and remember algorithm for the simple disassembly line balancing problem
- Type-E disassembly line balancing problem with multi-manned workstations
- Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations
- Robotic disassembly line balancing problem: a mathematical model and ant colony optimization approach
- Balancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approach
- An efficient hybrid artificial bee colony algorithm for disassembly line balancing problem with sequence-dependent part removal times
Cited In (10)
- Balancing fuzzy multi-objective two-sided assembly lines via Bees Algorithm
- Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations
- Title not available (Why is that?)
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches
- Improved artificial bee colony algorithm for disassembly line balancing problem
- Balancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approach
- A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
- An effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly lines
- Type-E disassembly line balancing problem with multi-manned workstations
- An efficient hybrid artificial bee colony algorithm for disassembly line balancing problem with sequence-dependent part removal times
This page was built for publication: Models and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6159499)