Determining optimal number of samples for constructing multivariate control charts
From MaRDI portal
Publication:3085306
DOI10.1080/03610918.2010.534225zbMATH Open1211.65012OpenAlexW2158021791MaRDI QIDQ3085306FDOQ3085306
Jeh-Nan Pan, Sheau-Chiann Chen
Publication date: 31 March 2011
Published in: Communications in Statistics. Simulation and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610918.2010.534225
Recommendations
- Multivariate control charts: An optimizaton approach to the effective use and measurement of performance
- The effects of sample sizes in phases I and II on \(p\) control chart performance
- Optimal design of the variable sampling size and sampling interval variable dimension T\(^2\) control chart for monitoring the mean vector of a multivariate normal process
- Economic and economic statistical designs for moving average control charts
- Reduction of control-chart signal variablity for high-quality processes
Monte Carlo methods (65C05) Measures of association (correlation, canonical correlation, etc.) (62H20)
Cites Work
Cited In (2)
This page was built for publication: Determining optimal number of samples for constructing multivariate control charts
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3085306)