Hybrid flow-shop with adjustment
From MaRDI portal
Publication:3085447
Recommendations
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Minimizing makespan in hybrid flowshops
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
- Optimal scheduling of a two-stage hybrid flow shop
Cites work
This page was built for publication: Hybrid flow-shop with adjustment
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3085447)