Scheduling partially ordered jobs faster than 2ⁿ
From MaRDI portal
Publication:3092238
Abstract: In the SCHED problem we are given a set of n jobs, together with their processing times and precedence constraints. The task is to order the jobs so that their total completion time is minimized. SCHED is a special case of the Traveling Repairman Problem with precedences. A natural dynamic programming algorithm solves both these problems in 2^n n^O(1) time, and whether there exists an algorithms solving SCHED in O(c^n) time for some constant c < 2 was an open problem posted in 2004 by Woeginger. In this paper we answer this question positively.
Recommendations
- Scheduling partially ordered jobs faster than \(2^n\)
- scientific article; zbMATH DE number 3894817
- On the approximability of average completion time scheduling under precedence constraints.
- Scheduling problems with partially ordered jobs
- Single Machine Scheduling with Precedence Constraints of Dimension 2
Cited in
(16)- The poset scheduling problem
- The triangle scheduling problem
- Optimization of schedules with precedence logical conditions
- Moderate exponential-time algorithms for scheduling problems
- Parallel machine scheduling with minimum number of tardy jobs: approximation and exponential algorithms
- Succinct representation of linear extensions via MDDs and its application to scheduling under precedence constraints
- Exponential time algorithms for just-in-time scheduling problems with common due date and symmetric weights
- Precedence scheduling with unit execution time is equivalent to parametrized biclique
- On an extension of the Sort \& Search method with application to scheduling theory
- On exact algorithms for the permutation CSP
- Solving the 2-disjoint connected subgraphs problem faster than \(2^n\)
- Decision diagrams for solving a job scheduling problem under precedence constraints
- Scheduling partially ordered jobs faster than \(2^n\)
- Scheduling problems with partially ordered jobs
- Moderate exponential-time algorithms for scheduling problems
- Partially ordered knapsack and applications to scheduling
This page was built for publication: Scheduling partially ordered jobs faster than \(2^{n }\)
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3092238)