The poset scheduling problem
From MaRDI portal
Let P and Q be two finite posets and for each \(p\in P\) and \(q\in Q\) let c(p,q) be a specified (real-valued) cost. The poset scheduling problem is to find a function s:P\(\to Q\) such that \(\sum_{p\in P}c(p,s(p))\) is minimized, subject to the constraints that \(p<p'\) in P implies \(s(p)<s(p')\) in Q. We prove that the poset scheduling problem is NP-hard. This problem with a totally ordered poset Q is proved to be transformable to the closed set problem or the minimum cut problem in a network.
Recommendations
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Maximal Closure of a Graph and Applications to Combinatorial Problems
- Resource constrained scheduling as generalized bin packing
- Selected Applications of Minimum Cuts in Networks
- Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints
Cited in
(9)- Schedule-induced posets
- A note on order preserving matchings
- The setup polytope of \(N\)-sparse posets
- Maximizing the expected net present value in a project with uncertain cash flows
- scientific article; zbMATH DE number 4033467 (Why is no real title available?)
- scientific article; zbMATH DE number 4189460 (Why is no real title available?)
- On project scheduling with irregular starting time costs
- Minimizing the sum cost in linear extensions of a poset
- Project scheduling with irregular costs: complexity, approximability, and algorithms
This page was built for publication: The poset scheduling problem