Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems
From MaRDI portal
Publication:3114302
DOI10.1080/00207540802426201zbMath1231.90166OpenAlexW2047098001MaRDI QIDQ3114302
Nidhal Rezg, Mehdi Radhoui, Anis Chelbi
Publication date: 4 February 2012
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802426201
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items
An integrated model based on statistical process control and maintenance for two-stage dependent processes ⋮ Preventive maintenance and replacement policies for deteriorating production systems subject to imperfect repairs ⋮ A mathematical model and optimization of total production cost and quality for a deteriorating production process
Cites Work
- The impact of preventive maintenance on system cost and buffer size
- Maintenance optimization of a production system with buffer capacity
- Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
- Production Lot Sizing with Machine Breakdowns
- Production Batching with Machine Breakdowns and Safety Stocks
- Manufacturing flow control and preventing maintenance: a stochastic control approach