The impact of preventive maintenance on system cost and buffer size

From MaRDI portal
Publication:1278419

DOI10.1016/0377-2217(95)00313-4zbMath0926.90032OpenAlexW1964817188MaRDI QIDQ1278419

Russell D. Meller, David S. Kim

Publication date: 22 February 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(95)00313-4




Related Items (22)

Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenanceSimulation study of a bottleneck-based dispatching policy for a maintenance workforceJoint optimization of maintenance, buffers and machines in manufacturing linesOptimal Preventive Maintenance of a Production-Inventory System When the Action of “Idling” Is PermissibleAn economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdownEvaluation of unreliable flow lines with limited buffer capacities and spare part provisioningJoint optimisation of maintenance and buffer size in a manufacturing systemOptimal maintenance of a production system with \(L\) intermediate buffersSimultaneous determination of production and maintenance schedules using in‐line equipment condition and yield informationJoint optimal inventory control and preventive maintenance policyAnalysis of joint maintenance and production policies under a subcontracting constraintAn integrated production and maintenance model for one failure prone machine-finite capacity buffer system for perishable products with constant demandPreventive maintenance of manufacturing systems under environmental constraintsOptimal maintenance of two stochastically deteriorating machines with an intermediate bufferIntermediate buffer analysis for a production systemHeuristics for the economic production quantity problem under restrictions on production and maintenance timeCapacity estimation of a multi-product unreliable production lineSpare parts or buffer? How to design a transfer line with unreliable machinesIntegrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systemsOptimal preventive maintenance of a production system with an intermediate bufferCapacity improvement of an unreliable production line -- an analytical approachTime and inventory dependent optimal maintenance policies for single machine workstations: an MDP approach



Cites Work


This page was built for publication: The impact of preventive maintenance on system cost and buffer size