The impact of preventive maintenance on system cost and buffer size
From MaRDI portal
Publication:1278419
DOI10.1016/0377-2217(95)00313-4zbMath0926.90032OpenAlexW1964817188MaRDI QIDQ1278419
Russell D. Meller, David S. Kim
Publication date: 22 February 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(95)00313-4
modelingMarkov processesproduction systemsmaintenancepreventive maintenanceoptimal buffer inventory level
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (22)
Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance ⋮ Simulation study of a bottleneck-based dispatching policy for a maintenance workforce ⋮ Joint optimization of maintenance, buffers and machines in manufacturing lines ⋮ Optimal Preventive Maintenance of a Production-Inventory System When the Action of “Idling” Is Permissible ⋮ An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown ⋮ Evaluation of unreliable flow lines with limited buffer capacities and spare part provisioning ⋮ Joint optimisation of maintenance and buffer size in a manufacturing system ⋮ Optimal maintenance of a production system with \(L\) intermediate buffers ⋮ Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information ⋮ Joint optimal inventory control and preventive maintenance policy ⋮ Analysis of joint maintenance and production policies under a subcontracting constraint ⋮ An integrated production and maintenance model for one failure prone machine-finite capacity buffer system for perishable products with constant demand ⋮ Preventive maintenance of manufacturing systems under environmental constraints ⋮ Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer ⋮ Intermediate buffer analysis for a production system ⋮ Heuristics for the economic production quantity problem under restrictions on production and maintenance time ⋮ Capacity estimation of a multi-product unreliable production line ⋮ Spare parts or buffer? How to design a transfer line with unreliable machines ⋮ Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems ⋮ Optimal preventive maintenance of a production system with an intermediate buffer ⋮ Capacity improvement of an unreliable production line -- an analytical approach ⋮ Time and inventory dependent optimal maintenance policies for single machine workstations: an MDP approach
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- The marginal cost analysis and its application to repair and replacement policies
- Maintenance optimization of a production system with buffer capacity
- An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking
- A Preventive Replacement Policy for Units Subject to Intermittent Demand
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Preventive Replacement of an Intermittently-Used System
- Production Lot Sizing with Machine Breakdowns
- Production Batching with Machine Breakdowns and Safety Stocks
- Bibliography for Reliability and Availability of Stochastic Systems
- Estimating the distribution and variance of time to produce a fixed lot size given deterministic processing times and random downtimes
- Safety Stock versus Safety Time in MRP Controlled Production Systems
- Markov chains and summability methods
This page was built for publication: The impact of preventive maintenance on system cost and buffer size