Spare parts or buffer? How to design a transfer line with unreliable machines
From MaRDI portal
Publication:2301947
DOI10.1016/j.ejor.2019.12.005zbMath1441.90054OpenAlexW2998462092WikidataQ126471670 ScholiaQ126471670MaRDI QIDQ2301947
F. E. Sachs, Gudrun P. Kiesmüller
Publication date: 25 February 2020
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2019.12.005
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Related Items
Evaluation of unreliable flow lines with limited buffer capacities and spare part provisioning, A data-driven approach for condition-based maintenance optimization, Condition-based maintenance optimization based on matrix algebra
Cites Work
- Unnamed Item
- Discrete time model for two-machine one-buffer transfer lines with restart policy
- Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer
- Manufacturing flow line systems: A review of models and analytical results
- Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
- The impact of preventive maintenance on system cost and buffer size
- Variance of the throughput of an \(N\)-station production line with no intermediate buffers and time dependent failures
- Decomposition of unreliable assembly/disassembly networks with limited buffer capacity and random processing times
- Maintenance optimization of a production system with buffer capacity
- Asymptotic variance rate of the output of a transfer line with no buffer storage and cycle-dependent failures
- Balancing a robotic spot welding manufacturing line: an industrial case study
- OR in spare parts management: a review
- Intermediate buffer analysis for a production system
- Joint optimization of maintenance, buffer, and spare parts for a production system
- Joint optimisation of maintenance and buffer size in a manufacturing system
- Optimal preventive maintenance of a production system with an intermediate buffer
- An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking
- Modeling Emergency Supply Flexibility in a Two-Echelon Inventory System
- An Algorithmic Solution to Two-Stage Transfer Lines with Possible Scrapping of Units
- An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
- Comparisons of two-machine line models in throughput analysis