Evaluation of unreliable flow lines with limited buffer capacities and spare part provisioning
From MaRDI portal
Publication:2672074
DOI10.1016/J.EJOR.2022.01.005OpenAlexW4206374009MaRDI QIDQ2672074FDOQ2672074
Authors: F. E. Sachs, Stefan Helber, G. P. Kiesmüller
Publication date: 8 June 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2022.01.005
Recommendations
- Approximations of time-dependent unreliable flow lines with finite buffers
- Spare parts or buffer? How to design a transfer line with unreliable machines
- Throughput, flow times, and service level in an unreliable assembly system
- Throughput of flow lines with unreliable parallel-machine workstations and blocking
- Availability and throughput of unreliable, unbuffered production lines with non-homogeneous deterministic processing times
Cites Work
- Optimal inventory modeling of systems. Multi-echelon techniques
- Modeling emergency supply flexibility in a two-echelon inventory system
- Multi-item spare parts systems with lateral transshipments and waiting time constraints
- Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
- An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking
- Approximate analysis of transfer lines with unreliable machines and finite buffers
- Analysis and design of discrete part production lines
- Manufacturing flow line systems: A review of models and analytical results
- A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers
- Finite Queues in Series with Exponential or Erlang Service Times—A Numerical Approach
- A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material
- Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers
- Performance analysis of flow lines with non-linear flow of material
- Approximate models of assembly systems with finite inventory banks
- The impact of preventive maintenance on system cost and buffer size
- Decomposition of unreliable assembly/disassembly networks with limited buffer capacity and random processing times
- An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
- Joint optimization of maintenance, buffer, and spare parts for a production system
- OR in spare parts management: a review
- Intermediate buffer analysis for a production system
- Approximate analysis of unreliable transfer lines with splits in the flow of material
- Spare parts or buffer? How to design a transfer line with unreliable machines
Cited In (6)
- Approximations of time-dependent unreliable flow lines with finite buffers
- Evaluation of stochastic flow lines with provisioning of auxiliary material
- How does variability in input load relate to the probability of critically delayed delivery in a simple multipart re-entrant flow-line problem?
- Title not available (Why is that?)
- Throughput, flow times, and service level in an unreliable assembly system
- Spare parts or buffer? How to design a transfer line with unreliable machines
This page was built for publication: Evaluation of unreliable flow lines with limited buffer capacities and spare part provisioning
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2672074)