Joint optimisation of maintenance and buffer size in a manufacturing system
From MaRDI portal
Publication:2432912
DOI10.1016/J.EJOR.2005.08.007zbMATH Open1137.90457OpenAlexW2023090401MaRDI QIDQ2432912FDOQ2432912
Authors: Yanyan Li
Publication date: 25 October 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.08.007
Recommendations
- Maintenance optimization of a production system with buffer capacity
- Joint optimization of maintenance, buffer, and spare parts for a production system
- Joint optimization of maintenance, buffers and machines in manufacturing lines
- Markov decision models for the optimal maintenance of a production unit with an upstream buffer
- Optimal maintenance of a production system with \(L\) intermediate buffers
Cites Work
- Maintenance optimization of a production system with buffer capacity
- The impact of preventive maintenance on system cost and buffer size
- Optimal preventive maintenance of a production system with an intermediate buffer
- Constraint time buffer determination model
- Targeting quality improvement efforts through knowledge of capacity constraints: the case of a low technology ceramics manufacturer
Cited In (8)
- Conservation of filtering in manufacturing systems with unreliable machines and finished goods buffers
- Joint optimization of maintenance, buffers and machines in manufacturing lines
- Universal distribution of batch completion times and time-cost tradeoff in a production line with arbitrary buffer size
- Intermediate buffer analysis for a production system
- Joint optimization of maintenance, buffer, and spare parts for a production system
- Spare parts or buffer? How to design a transfer line with unreliable machines
- Enhancement of Theory of Constraints replenishment using a novel generic buffer management procedure
- Optimal buffer space size in two-stage machining systems with Markovian or non-Markovian tool life processes
Uses Software
This page was built for publication: Joint optimisation of maintenance and buffer size in a manufacturing system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2432912)