scientific article; zbMATH DE number 6830874
From MaRDI portal
Publication:3131282
DOI10.13195/J.KZYJC.2016.0489zbMATH Open1389.90114MaRDI QIDQ3131282FDOQ3131282
Authors: Hua Gong, Ermei Zhang, Fang Liu
Publication date: 29 January 2018
Title of this publication is not available (Why is that?)
Recommendations
- The coordination of transportation and batching scheduling
- The coordination of transportation and serial batching scheduling
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- New results on the coordination of transportation and batching scheduling
- scientific article; zbMATH DE number 4130176
- Joint production and transportation scheduling in flexible manufacturing systems
- Revisit of the scheduling problems with integrated production and delivery on parallel batching machines
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06)
Cited In (14)
- Scenario analysis-based decision and coordination in supply chain management with production and transportation scheduling
- Coke production scheduling problem: a parallel machine scheduling with batch preprocessings and location-dependent processing times
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Integrated production and transportation on parallel batch machines to minimize total weighted delivery time
- Coordination of production and transportation in supply chain scheduling
- A SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM WITH CONSIDERATION OF PRODUCT-DEPENDENT TRANSPORTATION
- Title not available (Why is that?)
- A hybrid two-stage transportation and batch scheduling problem
- Two-echelon location routing synchronized with production schedules and time windows
- The coordination of transportation and batching scheduling
- New results on the coordination of transportation and batching scheduling
- Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation
- Title not available (Why is that?)
- The coordination of transportation and serial batching scheduling
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3131282)