Coke production scheduling problem: a parallel machine scheduling with batch preprocessings and location-dependent processing times
From MaRDI portal
Publication:1725594
DOI10.1016/j.cor.2018.12.002zbMath1458.90322OpenAlexW2904137385MaRDI QIDQ1725594
Chengbin Chu, Dapeng Yang, Feng Chu, Ming Liu, Jun-Kai He
Publication date: 14 February 2019
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2018.12.002
Related Items
Multi-core processor scheduling with respect to data bus bandwidth, The piggyback transportation problem: transporting drones launched from a flying warehouse, Flow shop scheduling problem with position-dependent processing times
Cites Work
- Modeling the parallel machine scheduling problem with step deteriorating jobs
- Isomorphic scheduling problems
- Time-dependent scheduling
- Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
- Equivalent time-dependent scheduling problems
- A note on scheduling on a single processor with speed dependent on a number of executed jobs
- Preemptive models of scheduling with controllable processing times and of scheduling with imprecise computation: a review of solution approaches
- Parallel-machine scheduling with past-sequence-dependent delivery times and learning effect
- An approximation algorithm based on game theory for scheduling simple linear deteriorating jobs
- A survey of scheduling with controllable processing times
- Unrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing time
- Pareto and scalar bicriterion optimization in scheduling deteriorating jobs
- Scheduling with time dependent processing times: Review and extensions
- Scheduling jobs with position-dependent processing times
- Multiagent Scheduling
- Scheduling