Scheduling of railway track maintenance activities and crews
From MaRDI portal
Publication:3157774
DOI10.1057/palgrave.jors.2600612zbMath1140.90400OpenAlexW2063912842MaRDI QIDQ3157774
No author found.
Publication date: 19 January 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600612
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25)
Related Items (9)
Multi-objective model for optimizing railway infrastructure asset renewal ⋮ Timetable rearrangement to cope with railway maintenance activities ⋮ Short-term manpower planning for MRT carriage maintenance under mixed deterministic and stochastic demands ⋮ Workforce-constrained maintenance scheduling for military aircraft fleet: a case study ⋮ Multi-period maintenance scheduling of tree networks with minimum flow disruption ⋮ Scheduling of maintenance windows in a mining supply chain rail network ⋮ On Time Selection for Track Possession Assignment at the Railway Station ⋮ Optimizing large scale upgradations involving movable assets ⋮ Operation and preventive maintenance scheduling for containerships: mathematical model and solution algorithm
This page was built for publication: Scheduling of railway track maintenance activities and crews