Scheduling preventive railway maintenance activities
From MaRDI portal
Publication:3182654
DOI10.1057/palgrave.jors.2602085zbMath1171.90392OpenAlexW2120070400MaRDI QIDQ3182654
Gabriella Budai, Rommert Dekker, Dennis Huisman
Publication date: 15 October 2009
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://repub.eur.nl/pub/1632/ei200441.pdf
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (13)
Multi-objective model for optimizing railway infrastructure asset renewal ⋮ A combined column generation and heuristics for railway short-term rolling stock planning with regular inspection constraints ⋮ Timetable rearrangement to cope with railway maintenance activities ⋮ Shunting operations at flat yards: retrieving freight railcars from storage tracks ⋮ Scheduling preventive railway maintenance activities with resource constraints ⋮ A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines ⋮ Maximising the weighted number of activity execution modes in project planning ⋮ Scheduling of maintenance work of a large-scale tramway network ⋮ Scheduling of maintenance windows in a mining supply chain rail network ⋮ Optimizing large scale upgradations involving movable assets ⋮ The stochastic opportunistic replacement problem. II: A two-stage solution approach ⋮ Operation and preventive maintenance scheduling for containerships: mathematical model and solution algorithm ⋮ Workforce routing and scheduling for electricity network maintenance with downtime minimization
This page was built for publication: Scheduling preventive railway maintenance activities