scientific article; zbMATH DE number 4191382
From MaRDI portal
zbMATH Open0722.90031MaRDI QIDQ3211097FDOQ3211097
Authors: R. Conterno, A. Allasia, A. Proverbio
Publication date: 1991
Title of this publication is not available (Why is that?)
Recommendations
- Exact solution procedures for certain planning problems in flexible manufacturing systems
- Modelling and scheduling of a flexible manufacturing system
- scientific article; zbMATH DE number 4204098
- Routing flexibility and production scheduling in a flexible manufacturing system
- Conceptual framework for lot-sizing and scheduling of flexible flow lines
heuristicsdue datesproduction planningbranch-and-boundflexible manufacturing systemrelease timesmulti-stage decision
Applications of mathematical programming (90C90) Computational methods for problems pertaining to operations research and mathematical programming (90-08) Production models (90B30)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3211097)