Over-time and over-level replacement policies with random working cycles
From MaRDI portal
Publication:331834
DOI10.1007/S10479-015-1871-ZzbMATH Open1347.90029OpenAlexW1975395240MaRDI QIDQ331834FDOQ331834
Authors: Xufeng Zhao, Toshio Nakagawa
Publication date: 27 October 2016
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-015-1871-z
Recommendations
- Replacement policies for age and working numbers with random life cycle
- Periodic replacement policies with shortage and excess costs
- Optimization problems of replacement first or last in reliability theory
- scientific article; zbMATH DE number 3970476
- Which is better for replacement policies with continuous or discrete scheduled times?
Cites Work
- Title not available (Why is that?)
- Shock and damage models in reliability theory
- Reliability and optimal maintenance.
- Extended optimal age-replacement policy with minimal repair of a system subject to shocks
- Complex system maintenance handbook
- Maintenance for industrial systems
- Optimization problems of replacement first or last in reliability theory
- Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy
- Title not available (Why is that?)
- Title not available (Why is that?)
- Optimal Policies for a Database System with Two Backup Schemes
- Stochastic processes with applications to reliability theory
- Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks
Cited In (5)
- Improved approaches to minimize the makespan on single-machine scheduling with periodic preventive maintenance activities
- \(GM(1,1)\) modeling of failure rate prediction for preventive maintenance
- Replacement policies for age and working numbers with random life cycle
- Optimization problems of replacement first or last in reliability theory
- Which is better for replacement policies with continuous or discrete scheduled times?
This page was built for publication: Over-time and over-level replacement policies with random working cycles
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q331834)