scientific article; zbMATH DE number 3848955
From MaRDI portal
Publication:3318521
zbMATH Open0534.90046MaRDI QIDQ3318521FDOQ3318521
Authors: Parkash Lal Maggu, Hafiz Noor Mohd, Om Prakash
Publication date: 1983
Title of this publication is not available (Why is that?)
Recommendations
heuristic algorithm'3-machine, j-job' flow-shop scheduling'job transportation time'optimal or near optimal solution
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35)
Cited In (9)
- Heuristic approach for \(N\)-job, 3-machine flow shop scheduling problem involving transportation time, break down time and weights of jobs
- Title not available (Why is that?)
- Title not available (Why is that?)
- Constrained multi-stage flowshop scheduling including transportation time and weights of jobs with break-down interval having job block criteria, the processing time associated with their respective probabilities
- Title not available (Why is that?)
- On two machine flow-shop scheduling problem with transportation time of job
- Title not available (Why is that?)
- Title not available (Why is that?)
- Solving constrained flow-shop scheduling problems with three machines
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3318521)