Heuristic approach for N-job, 3-machine flow shop scheduling problem involving transportation time, break down time and weights of jobs

From MaRDI portal
Publication:2574384





Summary: This paper provides a new simple heuristic algorithm for a `3-Machine, \(n\)-job' flow-shop scheduling problem in which jobs are attached with weights to indicate their relative importance and the transportation time and break down intervals of machine are given. A heuristic approach method to find an optimal or near optimal sequence minimizing the total weighted mean production flow time for the problem has been discussed.











This page was built for publication: Heuristic approach for \(N\)-job, 3-machine flow shop scheduling problem involving transportation time, break down time and weights of jobs

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2574384)