Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
From MaRDI portal
Recommendations
- Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment
- Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness
- Scheduling of flow shop problems on 3 machines in fuzzy environment with double transport facility
- Parallel machine scheduling models with fuzzy processing times
- OPTIMAL SCHEDULING FOR AN AUTOMATED m-MACHINE FLOWSHOP
Cites work
- scientific article; zbMATH DE number 5506140 (Why is no real title available?)
- scientific article; zbMATH DE number 1783886 (Why is no real title available?)
- scientific article; zbMATH DE number 909506 (Why is no real title available?)
- scientific article; zbMATH DE number 7174151 (Why is no real title available?)
- A General Algorithm for Solution of the n-Job, M-Machine Sequencing Problem of the Flow Shop
- A multi-objective optimization for preemptive identical parallel machines scheduling problem
- A state-of-the-art review of parallel-machine scheduling research
- An Algorithm for the Traveling Salesman Problem
- Combinatorial optimization models for production scheduling in automated manufacturing systems
- Complexity of single machine, multi-criteria scheduling problems
- Development of M-Stage Decision Rule for Scheduling N Jobs Through M Machines
- Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment
- Heuristic approach for \(N\)-job, 3-machine flow shop scheduling problem involving transportation time, break down time and weights of jobs
- Job sequencing with fuzzy processing times
- Minimizing makespan of stochastic customer orders in cellular manufacturing systems with parallel machines
- Minimizing the makespan on two identical parallel machines with mold constraints
- Optimal two- and three-stage production schedules with set-up time included
- Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
Cited in
(1)
This page was built for publication: Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6193885)