Note—On “Optimizing Field Repair Kits Based on Job Completion Rate”
From MaRDI portal
Publication:3340472
DOI10.1287/MNSC.30.8.1025zbMATH Open0548.90023OpenAlexW2104524882MaRDI QIDQ3340472FDOQ3340472
Authors: Salvatore T. March, Gary D. Scudder
Publication date: 1984
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.30.8.1025
Recommendations
- Multiple period repair kit problem with a job completion criterion: A case study
- The Repair Kit Problem Revisited
- Improving spare parts management for field services: a model and a case study for the repair kit problem
- The multiple-job repair kit problem
- Optimising a general repair kit problem with a service constraint
Reliability, availability, maintenance, inspection in operations research (90B25) Inventory, storage, reservoirs (90B05)
Cited In (6)
- The repair kit problem with positive replenishment lead times and fixed ordering costs
- Single period, single product newsvendor model with random supply shock
- The repair kit problem with imperfect advance demand information
- Inventory control of service parts in the final phase: A central depot and repair kits
- The added value of advance demand information for the planning of a repair kit
- Title not available (Why is that?)
This page was built for publication: Note—On “Optimizing Field Repair Kits Based on Job Completion Rate”
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3340472)