The added value of advance demand information for the planning of a repair kit
From MaRDI portal
Publication:6100688
DOI10.1007/s10100-022-00809-1OpenAlexW4287147676MaRDI QIDQ6100688
Christoph Rippe, Gudrun P. Kiesmüller
Publication date: 22 June 2023
Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10100-022-00809-1
Cites Work
- Multiple period repair kit problem with a job completion criterion: A case study
- The repair kit problem with positive replenishment lead times and fixed ordering costs
- The repair kit problem with imperfect advance demand information
- The multiple-job repair kit problem
- Optimising a general repair kit problem with a service constraint
- Knowledge You Can Act on: Optimal Policies for Assembly Systems with Expediting and Advance Demand Information
- Integrating Replenishment Decisions with Advance Demand Information
- Replenishment Strategies for Distribution Systems Under Advance Demand Information
- Inventory Management with Advance Demand Information and Flexible Delivery
- Note—On “Optimizing Field Repair Kits Based on Job Completion Rate”
- Controlling Inventories in Divergent Supply Chains with Advance-Order Information
- Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System
- Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines
- Note—Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items
- Optimizing Field Repair Kits Based on Job Completion Rate
- The Repair Kit Problem Revisited
- Note—A Multiple-Item Inventory Model with a Job Completion Criterion
- Inventory Control with Limited Capacity and Advance Demand Information
- Improving spare parts management for field services: a model and a case study for the repair kit problem
- Customer-Order Information, Leadtimes, and Inventories
This page was built for publication: The added value of advance demand information for the planning of a repair kit