Multiple period repair kit problem with a job completion criterion: A case study
From MaRDI portal
Publication:1129889
DOI10.1016/0377-2217(94)00177-EzbMATH Open0927.90017OpenAlexW2048836763MaRDI QIDQ1129889FDOQ1129889
Authors: D. Heeremans, L. F. Gelders
Publication date: 16 August 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00177-e
Recommendations
- The multiple-job repair kit problem
- The Repair Kit Problem Revisited
- Improving spare parts management for field services: a model and a case study for the repair kit problem
- Note—On “Optimizing Field Repair Kits Based on Job Completion Rate”
- Optimising a general repair kit problem with a service constraint
Cites Work
Cited In (10)
- The repair kit problem with positive replenishment lead times and fixed ordering costs
- The repair kit problem with fixed delivery costs
- The repair kit problem with imperfect advance demand information
- Inventory control of service parts in the final phase: A central depot and repair kits
- The multiple-job repair kit problem
- Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests
- The added value of advance demand information for the planning of a repair kit
- Optimising a general repair kit problem with a service constraint
- The Repair Kit Problem Revisited
- Note—On “Optimizing Field Repair Kits Based on Job Completion Rate”
This page was built for publication: Multiple period repair kit problem with a job completion criterion: A case study
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1129889)