Optimizing Field Repair Kits Based on Job Completion Rate
From MaRDI portal
Publication:3968733
DOI10.1287/mnsc.28.11.1328zbMath0502.90032OpenAlexW2050672776MaRDI QIDQ3968733
John W. Mamer, Stephen A. Smith
Publication date: 1982
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.28.11.1328
selection problemjob completion ratemaximal flow/minimal cut network algorithmson-site equipment repairsoptimal kit of parts and toolspart demands
Related Items
Maximal closure on a graph with resource constraints ⋮ Optimising a general repair kit problem with a service constraint ⋮ Unnamed Item ⋮ Single period, single product newsvendor model with random supply shock ⋮ The repair kit problem with imperfect advance demand information ⋮ Multiple period repair kit problem with a job completion criterion: A case study ⋮ Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests ⋮ The added value of advance demand information for the planning of a repair kit ⋮ Inventory Management: An Overview, Canadian Publications, Practical Applications and Suggestions for Future Research ⋮ Modelling and solving an FMS part selection problem ⋮ The repair kit problem with positive replenishment lead times and fixed ordering costs ⋮ Ordered optimal solutions and parametric minimum cut problems ⋮ Inventory control of service parts in the final phase: A central depot and repair kits