scientific article; zbMATH DE number 3891075
zbMATH Open0558.90043MaRDI QIDQ3347607FDOQ3347607
Authors: Jacek Blazewicz, Jan Węglarz
Publication date: 1984
Title of this publication is not available (Why is that?)
Recommendations
computational complexitymaximum latenessresource allocationflow shopparallel machinesresource constraintsopen shopjob shopmean flow timeschedule lengthschedule performance measures
Linear programming (90C05) Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) Integer programming (90C10)
Cited In (24)
- Title not available (Why is that?)
- A multivariate complexity analysis of the material consumption scheduling problem
- Title not available (Why is that?)
- The complexity of multidimensional periodic scheduling
- Title not available (Why is that?)
- NP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion time
- Modeling of a scheduling problem with expected availability of resources
- Assessing the resource usage in scheduling with incompatibilities
- Complexity analysis of an assignment problem with controllable assignment costs and its applications in scheduling
- Fast combination of scheduling chains under resource and time constraints
- A historical note on the complexity of scheduling problems
- Complexity of project scheduling problem with nonrenewable resources
- On the complexity of interval scheduling with a resource constraint
- Computer-Aided complexity classification of combinational problems
- Resource allocation by means of project networks: complexity results
- Title not available (Why is that?)
- Resource holding times: Computation and optimization
- Scheduling problems for parallel dedicated machines under multiple resource constraints.
- Problem of parallel machines with polymatroidal constraints
- Title not available (Why is that?)
- On the NP-hardness of two scheduling problems under linear constraints
- On the complexity of adjacent resource scheduling
- Complexity of the scheduling language RSV
- Scheduling of resource tasks
This page was built for publication: