Textile Production Systems: a Succession of Non-identical Parallel Processor Shops
From MaRDI portal
Publication:3354756
DOI10.1057/jors.1991.132zbMath0729.90754OpenAlexW2078999064MaRDI QIDQ3354756
No author found.
Publication date: 1991
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1991.132
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Case-oriented studies in operations research (90B90)
Related Items
Reformulations and an exact algorithm for unrelated parallel machine scheduling problems with setup times ⋮ Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach ⋮ ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times ⋮ An experimental investigation of scheduling non-identical, parallel processors with sequence-dependent set-up times and due dates ⋮ A flexible flowshop problem with total flow time minimization ⋮ The hybrid flow shop scheduling problem ⋮ An approximation algorithm for proportionate scheduling in the two-stage hybrid flow shop ⋮ Decomposition Methods for the Parallel Machine Scheduling Problem with Setups ⋮ A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility ⋮ Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time