A note on ``A heuristic method for two-stage hybrid flow shop with dedicated machines
From MaRDI portal
Publication:336500
DOI10.1016/J.COR.2013.03.009zbMATH Open1348.90267OpenAlexW2008332803MaRDI QIDQ336500FDOQ336500
Authors: Hatem Hadda
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2013.03.009
Recommendations
- On the two-stage hybrid flow shop with dedicated machines
- A note on the two-stage hybrid flow shop problem with dedicated machines
- Exact resolution of the two-stage hybrid flow shop with dedicated machines
- Méthode heuristique pour le problème de flow shop hybride avec machines dédiées
- A heuristic method for two-stage hybrid flow shop with dedicated machines
Cites Work
Cited In (5)
- On the two-stage hybrid flow shop with dedicated machines
- Méthode heuristique pour le problème de flow shop hybride avec machines dédiées
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines
- Exact resolution of the two-stage hybrid flow shop with dedicated machines
- A note on the two-stage hybrid flow shop problem with dedicated machines
This page was built for publication: A note on ``A heuristic method for two-stage hybrid flow shop with dedicated machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q336500)