scientific article; zbMATH DE number 7447420
From MaRDI portal
Publication:3384764
Recommendations
- Optimal production run time for a deteriorating production system under an extended inspection policy
- Optimal inspection and economical production quantity strategy for an imperfect production process
- Optimal inspection effort and scheduling for a manufacturing process with repair
- Optimal production and inspection policy while considering minimal repair, preventive maintenance error and inspection time
- Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system
- Optimal scheduling of inspection times in a production process with a finite planning horizon
- An approximate economically optimal inspection interval for production processes with finite run length
- An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length
- Development of optimal production, inspection and maintenance strategies with positive inspection time and preventive maintenance error
Cites work
- Economic Design of x̄-Control Charts under Weibull Shock Models
- Imperfect maintenance
- Integrated production and quality model under various preventive maintenance policies
- Optimal batch sizing in a multi-stage production system with rework consideration
- The value of setup cost reduction and process improvement for the economic production quantity model with defects
Cited in
(8)- An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework
- Optimal production and inspection policy while considering minimal repair, preventive maintenance error and inspection time
- Optimal inspection and economical production quantity strategy for an imperfect production process
- Optimum production and inspection modeling with minimal repair and rework considerations
- Development of optimal production, inspection and maintenance strategies with positive inspection time and preventive maintenance error
- An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length
- Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system
- Utilizing an approximative solution to obtain the real optimal solution for a production and inspection model
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3384764)