Economic lot-size problem for a cleaner manufacturing system with warm-up period
From MaRDI portal
Publication:3389366
DOI10.1051/RO/2019056zbMATH Open1467.90076OpenAlexW2945034925WikidataQ127861029 ScholiaQ127861029MaRDI QIDQ3389366FDOQ3389366
Authors: Amir Hossein Nobil, Abolfazl Kazemi, Ata Allah Taleizadeh
Publication date: 10 May 2021
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1051/ro/2019056
Recommendations
- Single item lot-sizing problem for a warm/cold process with immediate lost sales
- An EMQ model with inspections and random machine failures
- scientific article; zbMATH DE number 1487087
- A mathematical model on eco-friendly manufacturing system under probabilistic demand
- An economic production lot size model in an imperfect production system
exact solutionwarm-up periodeconomic manufacturing quantity (EMQ)non-linear programming (NLP)single machine production
This page was built for publication: Economic lot-size problem for a cleaner manufacturing system with warm-up period
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3389366)