Tabu search and lower bounds for a combined production-transportation problem
DOI10.1016/J.COR.2012.08.017zbMATH Open1349.90331DBLPjournals/cor/CondottaKMS13OpenAlexW2043270918WikidataQ59902330 ScholiaQ59902330MaRDI QIDQ340247FDOQ340247
Authors: Alessandro Condotta, Sigrid Knust, Dimitri Meier, N. V. Shakhlevich
Publication date: 14 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2012.08.017
Recommendations
- scientific article; zbMATH DE number 2114493
- A Lagrangian based branch-and-bound algorithm for production-transportation problems
- Tabu search with path relinking for an integrated production-distribution problem
- A tabu search procedure for coordinating production, inventory and distribution routing problems
- Solving transportation problems with nonlinear side constraints with tabu search
- A SIMPLICIAL BRANCH-AND-BOUND ALGORITHM FOR PRODUCTION-TRANSPORTATION PROBLEMS WITH INSEPARABLE CONCAVE PRODUCTION COST
- A relaxation-strategy-based modification branch-and-bound algorithm for solving a class of transportation-production problems
- A tabu search heuristic procedure for solving the transportation problem with exclusionary side constraints
- scientific article; zbMATH DE number 2209656
- scientific article; zbMATH DE number 194389
Deterministic scheduling theory in operations research (90B35) Transportation, logistics and supply chain management (90B06)
Cited In (10)
- A general purpose exact solution method for mixed integer concave minimization problems
- A review on integrated scheduling and outbound vehicle routing problems
- Solving the production transportation problem via a deterministic annealing neural network method
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines
- Tabu search with path relinking for an integrated production-distribution problem
- Preemptive scheduling in a two-stage supply chain to minimize the makespan
- Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation
- MIP formulations and heuristics for two-level production-transportation problems
- Solving a supply chain scheduling problem with non-identical job sizes and release times by applying a novel effective heuristic algorithm
- Enhanced Adjacent Extreme-point Search and Tabu Search for the Minimum Concave-cost Uncapacitated Transshipment Problem
This page was built for publication: Tabu search and lower bounds for a combined production-transportation problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q340247)