Three-stage hybrid-flowshop model for cross-docking
From MaRDI portal
(Redirected from Publication:340335)
Recommendations
- An operational scheduling model and algorithms of cross-docking
- Cross docking scheduling model and heuristic to minimize the number of tardy jobs
- Scheduling Problems in Cross Docking
- Minimizing makespan in two-stage hybrid cross docking scheduling problem
- Heuristics for cross-docking scheduling of truck arrivals, truck departures and shop-floor operations
Cited in
(8)- An operational scheduling model and algorithms of cross-docking
- Integrating workload smoothing and inventory reduction in three intermodal logistics platforms of a European car manufacturer
- Minimizing makespan in two-stage hybrid cross docking scheduling problem
- Cross docking scheduling model and heuristic to minimize the number of tardy jobs
- Inbound and outbound flow integration for cross-docking operations
- Probabilistic tabu search for the cross-docking assignment problem
- Mathematical estimation for maximum flow of goods within a cross-dock to reduce inventory
- Integrated scheduling and assignment of trucks at unit-load cross-dock terminals with mixed service mode dock doors
This page was built for publication: Three-stage hybrid-flowshop model for cross-docking
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q340335)