Cross docking scheduling model and heuristic to minimize the number of tardy jobs
From MaRDI portal
Publication:3051667
Recommendations
Cited in
(8)- Crossdocking— Just in Time scheduling: an alternative solution approach
- Scheduling Problems in Cross Docking
- Crossdocking—JIT scheduling with time windows
- Dynamic programming algorithm on two machines cross docking scheduling with total weighted completion time
- Minimizing makespan in two-stage hybrid cross docking scheduling problem
- Heuristics for cross-docking scheduling of truck arrivals, truck departures and shop-floor operations
- Three-stage hybrid-flowshop model for cross-docking
- Uncertain milk run-based cross docking scheduling: model and algorithms
This page was built for publication: Cross docking scheduling model and heuristic to minimize the number of tardy jobs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3051667)