Cross docking scheduling model and heuristic to minimize the number of tardy jobs

From MaRDI portal
Publication:3051667
Jump to:navigation, search

zbMATH Open1212.90168MaRDI QIDQ3051667FDOQ3051667


Authors: Liang Yu, Feng Chen Edit this on Wikidata


Publication date: 5 November 2010





Recommendations

  • Scheduling Problems in Cross Docking
  • Minimizing makespan in two-stage hybrid cross docking scheduling problem
  • Crossdocking—JIT scheduling with time windows
  • scientific article
  • Three-stage hybrid-flowshop model for cross-docking


zbMATH Keywords

heuristic algorithmlogistic optimization


Mathematics Subject Classification ID

Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)



Cited In (6)

  • Crossdocking— Just in Time scheduling: an alternative solution approach
  • Scheduling Problems in Cross Docking
  • Crossdocking—JIT scheduling with time windows
  • Dynamic programming algorithm on two machines cross docking scheduling with total weighted completion time
  • Minimizing makespan in two-stage hybrid cross docking scheduling problem
  • Uncertain milk run-based cross docking scheduling: model and algorithms





This page was built for publication: Cross docking scheduling model and heuristic to minimize the number of tardy jobs

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3051667)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3051667&oldid=16099706"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 3 February 2024, at 21:44. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki