Dynamic programming algorithm on two machines cross docking scheduling with total weighted completion time
From MaRDI portal
Publication:3609943
Recommendations
- Scheduling Problems in Cross Docking
- Minimizing the makespan in a two-machine cross-docking flow shop problem
- Cross docking scheduling model and heuristic to minimize the number of tardy jobs
- Crossdocking—JIT scheduling with time windows
- Minimizing makespan in two-stage hybrid cross docking scheduling problem
Cited in
(3)
This page was built for publication: Dynamic programming algorithm on two machines cross docking scheduling with total weighted completion time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3609943)