CUSUM Chart with Transformed Exponential Data
From MaRDI portal
Publication:3424200
DOI10.1080/03610920600728450zbMath1107.62123OpenAlexW2125249057MaRDI QIDQ3424200
No author found.
Publication date: 15 February 2007
Published in: Communications in Statistics - Theory and Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610920600728450
Applications of statistics in engineering and industry; control charts (62P30) Numerical analysis or methods applied to Markov chains (65C40)
Related Items (7)
On the performance of the adaptive EWMA chart for monitoring time between events ⋮ Simultaneously monitoring frequency and magnitude of events based on bivariate gamma distribution ⋮ Modified one-sided EWMA charts for monitoring time between events ⋮ On Statistical Design of the Cumulative Quantity Control Chart for Monitoring High Yield Processes ⋮ Optimization designs of the combined Shewhart-CUSUM control charts ⋮ Statistical computation and analyses for attribute events ⋮ BayesianX̄control limits for exponentially distributed measurements
Cites Work
- Unnamed Item
- Unnamed Item
- Counted Data CUSUM's
- Average Run Lengths for CUSUM Schemes When Observations Are Exponentially Distributed
- Cumulative quantity control charts for monitoring production processes
- A FORMULA FOR NORMALIZING TRANSFORMATION OF SOME STATISTICS
- Designing an effective exponential cusum chart without the use of nomographs
- An approach to the probability distribution of cusum run length
This page was built for publication: CUSUM Chart with Transformed Exponential Data