The tool transporter movements problem in flexible manufacturing systems
From MaRDI portal
Publication:3498887
DOI10.1080/00207540601070135zbMath1141.90402OpenAlexW2104803822MaRDI QIDQ3498887
Fatma Kılınç-Karzan, Azizoglu, Meral
Publication date: 19 May 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540601070135
Cites Work
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performance
- Minimizing total flow time on a single flexible machine
- Minimization of the Number of Tool Magazine Setups on Automated Machines: A Lagrangean Decomposition Approach
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants
- The online tool switching problem with non-uniform tool size
- Solutions to a modified tool loading problem for a single FMM
- Heuristic procedures for the parallel machine problem with tool switches
- Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
- Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter