Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches

From MaRDI portal
Publication:3818112


DOI10.1287/opre.36.5.767zbMath0665.90044MaRDI QIDQ3818112

Christopher S. Tang, Eric V. Denardo

Publication date: 1988

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.36.5.767


90B35: Deterministic scheduling theory in operations research

90B30: Production models


Related Items

Multiperiod tool and production assignment in flexible manufacturing systems, A hierarchical approach for metal parts fabrication, Heuristic procedures for the parallel machine problem with tool switches, Integrated methodology for board assignment and component allocation in printed circuit board assembly, Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter, Minimization of open orders: application of a re-distribution coordination policy, A methodology for cutting-tool management through the integration of CAPP and scheduling, Due date and cost-based FMS loading, scheduling and tool management, Heuristics for determining economic processing rates in a flexible manufacturing system, The scheduling problem of PCBs for multiple non-identical parallel machines, Production planning problems in printed circuit board assembly, Scheduling with tool changes to minimize total completion time: Basic results and SPT performance, Scheduling with tool changes to minimize total completion time under controllable machining conditions, The tool switching problem revisited, Job scheduling and management of wearing tools with stochastic tool lifetimes, The minimization of open stacks problem: a review of some properties and their use in pre-processing operations, Design of tool magazine and operational areas for a multi-tool machine, Auxiliary tool allocation in flexible manufacturing systems, On a pattern sequencing problem to minimize the maximum number of open stacks, Tool allocation and machining conditions optimization for CNC machines, Job sequencing rules for minimizing the expected makespan in flexible machines, The assembly of printed circuit boards: A case with multiple machines and multiple board types, Combinatorial optimization models for production scheduling in automated manufacturing systems, A model for warehouse order picking, Dynamic lot sizing and tool management in automated manufacturing systems, Exact solution procedures for certain planning problems in flexible manufacturing systems, Workload planning in small lot printed circuit board assembly, Impact of job-sequence on the down-time of a deteriorating flexible machine, Scheduling tasks on a flexible manufacturing machine to minimize tool change delays, An improved tabu search approach for solving the job shop scheduling problem with tooling constraints, Storage management of items in two levels of availability, Part type selection problem in flexible manufacturing systems: Tabu search algorithms, A planning and scheduling model for onsertion in printed circuit board assembly, A bi-objective coordination setup problem in a two-stage production system, Algorithms for the \(q\)-model clustering problem with application in switching cabinet manufacturing, Low-complexity algorithms for sequencing jobs with a fixed number of job-classes, Tool magazine arrangement and operations sequencing on CNC machines, The general two-level storage management problem: a reconsideration of the KTNS-rule, Unnamed Item, An integrated cutting stock and sequencing problem, Planning tool requirements for flexible manufacturing: an analytical approach, Application of clustering algorithm to optimizing tool handling management for FMS, The tool transporter movements problem in flexible manufacturing systems, Sequencing of parts on single-stage multifunctional machining systems using a chaos-embedded simulated annealing algorithm, Design of a tool management system in a flexible cell, Analysis of partial setup strategies for solving the operational planning problem in parallel machine electronic assembly systems