Multiperiod tool and production assignment in flexible manufacturing systems
From MaRDI portal
Publication:4394267
DOI10.1080/00207549408957000zbMath0901.90121MaRDI QIDQ4394267
Sodhi, Manbir S., Suvrajeet Sen, Ronald G. Askin
Publication date: 11 June 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549408957000
90B30: Production models
Related Items
A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors, Tool magazine arrangement and operations sequencing on CNC machines
Uses Software
Cites Work
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants
- A Branch-and-Bound Method for the Fixed Charge Transportation Problem