An integrated vendor-buyer inventory model with order processing cost reduction
From MaRDI portal
Publication:3540827
DOI10.1080/09720502.2007.10700516zbMath1165.90318OpenAlexW2327751677MaRDI QIDQ3540827
Ji-Cheng Wu, Deng-Maw Tsai, Chao-Kuei Huang, Tzu-Liang Cheng
Publication date: 24 November 2008
Published in: Journal of Interdisciplinary Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/09720502.2007.10700516
Cites Work
- Coordinated supply chain management
- Investing in Reduced Setups in the EOQ Model
- Setup cost reduction in an inventory model with finite-range stochastic lead times
- Cyclic Scheduling for a Multi-product, Single-facility Production System Operating Under a Just-in-time Delivery Policy
- A study of an integrated inventory with controllable lead time