Cyclic Scheduling for a Multi-product, Single-facility Production System Operating Under a Just-in-time Delivery Policy
DOI10.1057/JORS.1996.118zbMATH Open0867.90065OpenAlexW2037043749MaRDI QIDQ4717136FDOQ4717136
Authors: Vijay S. Nori, Bhaba R. Sarker
Publication date: 13 July 1997
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1996.118
Recommendations
- Optimal production and setup scheduling: A one-machine, two-product system
- The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies
- Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs
- Backtracking and its Amoebic Properties in One-dimensional Machine Location Problems
just-in-timecyclic schedulingvariable setup costsingle-product manufacturing systemoptimal batch sizefixed-quantity, periodic delivery policymulti-product situation
Cited In (11)
- Nash and integrated solutions in a just-in-time seller-buyer supply chain with Buyer's ordering cost reductions
- An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy
- An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments
- An integrated vendor-buyer inventory model with order processing cost reduction
- An integrated inventory model involving manufacturing setup cost reduction in compound Poisson process
- An integrated inventory model under conditions of order processing cost reduction and permissible delay in payments
- Medium term production management for cyclic deliveries
- Operations planning for a multi-stage kanban system
- Rotation cycle schedulings for multi-item production systems.
- Inventory models with mixture of backorders involving reducible lead time and setup cost
- Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy
This page was built for publication: Cyclic Scheduling for a Multi-product, Single-facility Production System Operating Under a Just-in-time Delivery Policy
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4717136)