Effective overhead hoist transport dispatching based on the Hungarian algorithm for a large semiconductor FAB
From MaRDI portal
Publication:3636769
Recommendations
- Effectiveness of vehicle reassignment in a large-scale overhead hoist transport system
- Modified Hungarian algorithm and fuzzy logic control-based scheduling method for Interbay material handling system
- Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first
- Effective vehicle dispatching method minimising the blocking and delivery times in automatic material handling systems of 300 mm semiconductor fabrication
- Transports industriels routiers, un problème d'affectation avec réemploi sous contraintes
Cites work
- A multi-attribute dispatching rule for automated guided vehicle systems
- A review of design and control of automated guided vehicle systems
- An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines
- Design and operational issues in AGV-served manufacturing systems
- Effectiveness of vehicle reassignment in a large-scale overhead hoist transport system
- Scheduling and routing of automated guided vehicles: A hybrid approach
- Survey of research in the design and control of automated guided vehicle systems
Cited in
(2)
This page was built for publication: Effective overhead hoist transport dispatching based on the Hungarian algorithm for a large semiconductor FAB
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3636769)