Scheduling deteriorating jobs with rejection on dominant machines
From MaRDI portal
Publication:3640924
DOI10.1007/S11741-008-0601-3zbMATH Open1183.90166OpenAlexW1969503557MaRDI QIDQ3640924FDOQ3640924
Authors: Yushao Cheng, Shijie Sun
Publication date: 11 November 2009
Published in: Journal of Shanghai University (English Edition) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11741-008-0601-3
Recommendations
- Two-machine flow-shop scheduling with deterioration and rejection
- Scheduling deteriorating jobs on a single machine with release times and rejection
- Scheduling linear deteriorating jobs with rejection on a single machine
- Parallel-machine scheduling with deteriorating jobs and rejection
- Scheduling linear deteriorating jobs with rejection on a single machine and batch delivery
Cites Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Techniques for scheduling with rejection
- Preemptive scheduling with rejection
- Title not available (Why is that?)
- Preemptive multiprocessor scheduling with rejection
- NP-hard cases in scheduling deteriorating jobs on dedicated machines
- A concise survey of scheduling with time-dependent processing times
- Scheduling with time dependent processing times: Review and extensions
- Flowshop scheduling with dominant machines
- On-line uniform machine scheduling with rejection
- Algorithms and Data Structures
- Title not available (Why is that?)
- Complexity analysis of job-shop scheduling with deteriorating jobs
- Title not available (Why is that?)
- Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
Cited In (5)
- Flowshop scheduling with learning effect and job rejection
- Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time
- Flow shop scheduling problems with deteriorating jobs under dominating machines
- Scheduling algorithm for permutation flowshop with limited waiting times and rejection
- Two-machine flow-shop scheduling with deterioration and rejection
This page was built for publication: Scheduling deteriorating jobs with rejection on dominant machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3640924)