scientific article; zbMATH DE number 3901880

From MaRDI portal
Publication:3680143





[For the entire collection see Zbl 0559.00012.] The paper suggests a new type of switching rules for standard inspection sampling plans by variables (MIL STD 414, ISO 3951). The cusum method, accumulating all previous sample results analogously to the sequential probability ratio test, is a natural candidate for governing a switching rule system. This idea is elaborated and discussed for normal variables with an upper specification limit for grading items in nondefectives and defectives. Simulation results are reported for three important cases, namely a shift or a linear trend in the quality level, and a lot series with outlier lots.











This page was built for publication:

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3680143)