Lot sizing for material requirements planning systems- an incremental cost approach
From MaRDI portal
Publication:3705205
Recommendations
- A decision support system for materials requirements planning lot-sizing
- An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems
- An integrated approach for production lot sizing and raw material purchasing
- Solution methods for material requirement planning with lot-size dependent lead times
- Lot sizing in capacitated production planning and control systems
- Lot Sizing with Inventory Bounds and Fixed Costs: Polyhedral Study and Computation
- Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
- A heuristic method for lot-sizing in multi-stage systems
- Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources
- Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon
Cited in
(5)- A comparison of two lot sizing-sequencing heuristics for the process industry
- Solution methods for material requirement planning with lot-size dependent lead times
- Planning lot sizes and capacity requirements in a single stage production system
- Lot sizing in capacitated production planning and control systems
- A decision support system for materials requirements planning lot-sizing
This page was built for publication: Lot sizing for material requirements planning systems- an incremental cost approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3705205)