scientific article; zbMATH DE number 3986992
From MaRDI portal
Publication:3750455
[For the entire collection see Zbl 0594.90016.] The problem of the optimal allocation of labor resources in the forest industry among works on current production output and the construction of new forest industrial complexes is investigated. Subject to several assumptions this problem is reduced to a mathematical problem of optimal control with nonfixed time, and is solved completely for the case when the production function is of the Cobb-Douglass type. The solution is obtained in the form of simple formulas permitting natural economic interpretation.
Recommendations
- Optimal resource allocation program in a two-sector economic model with a Cobb-Douglas production function
- Optimal resource allocation in a two-sector economy with an integral functional: theoretical analysis and numerical experiments
- Investigating a two-sector model with an integrating-type functional cost
- Optimal resource allocation program in a two-sector economic model with an integral type functional for various amortization factors
- scientific article; zbMATH DE number 610238
Cited in
(4)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3750455)